Supply chain & operations · OEE

Overall equipment effectiveness

How much good output a line produced compared with what it could have produced running perfectly.

availability × performance × quality Unit percentage Usual grain shift × line

01 What it is

Why anyone looks at this number

In one sentence

How much good output a line produced compared with what it could have produced running perfectly.

It turns "the factory is busy" into a number, and it separates the three very different reasons capacity disappears: downtime, slow running and scrap.

02 The formula

How it is worked out

oeedefinition
Overall equipment effectiveness = availability × performance × quality

grain  : shift × line
unit   : percentage
source : MES or line-side data capture

Agree what counts as planned time. Excluding planned maintenance and changeovers is normal, but the exclusion list is the entire argument — write it down.

03 Worked example

The same number, with real inputs

Inputs
Availability88%
Performance92%
Quality97%
Calculation0.88 × 0.92 × 0.97
Result78.5%

One fifth of capacity is gone. The speed loss alone is worth more than most capex proposals, and costs nothing to investigate.

04 What moves it

Four things that actually change this number

Driver 01

Downtime

Breakdowns, changeovers, waiting for material or people.

Driver 02

Speed losses

Running below the design rate, usually unnoticed and continuous.

Driver 03

Quality losses

Scrap and rework, including start-up waste after every changeover.

Driver 04

Product mix

Some products simply run slower than the design product.

05 Where the number lives

The system, the record and the fields

System of recordKey recordFields you need
MES or line-side data captureWork order and Asset / Line planned_time, downtime, ideal_cycle_time, total_count, good_count

Agree what counts as planned time. Excluding planned maintenance and changeovers is normal, but the exclusion list is the entire argument — write it down.

06 How it goes wrong

Three ways this metric misleads people

Mistake

Comparing OEE between lines

Different products and design speeds make the comparison meaningless.

Fix: Compare a line against itself over time.
Mistake

Chasing the number

Running long batches of easy product raises OEE and destroys service.

Fix: Report it beside schedule adherence and stock.
Mistake

Hiding losses in planned time

Everything inconvenient gets reclassified as planned and OEE improves on paper.

Fix: Fix the planned-time definition and audit changes to it.

08 Questions

Frequently asked

What is world-class OEE?

Around 85% is the figure usually quoted for discrete manufacturing, but it depends heavily on the process. The three components matter more than the headline.

Should OEE include changeovers?

If changeovers are a genuine constraint on your capacity, include them — otherwise you optimise the number by making fewer, longer runs, which hurts service.

One definition, everywhere it is used

SCIKIQ stores this metric once and serves it to every dashboard, board pack and agent that asks.

Book a live demo