Supply chain & operations · SA

Schedule adherence

How much of what you planned to make you actually made, in the order you planned it.

units_produced_as_scheduled ÷ units_scheduled Unit percentage Usual grain day × line

01 What it is

Why anyone looks at this number

In one sentence

How much of what you planned to make you actually made, in the order you planned it.

Every deviation ripples: a missed batch becomes a stockout, an expedited changeover, or overtime. It is the link between planning quality and service.

02 The formula

How it is worked out

schedule-adherencedefinition
Schedule adherence = units_produced_as_scheduled ÷ units_scheduled

grain  : day × line
unit   : percentage
source : Planning system compared with production confirmations

Compare against the frozen schedule, not the version updated during the shift. A schedule that follows reality always shows perfect adherence.

03 Worked example

The same number, with real inputs

Inputs
Scheduled84 batches
Produced as scheduled71 batches
Calculation71 ÷ 84
Result84.5%

One batch in six moved. Look at the reasons before adding capacity — if most are rush orders, the fix is in order management, not the factory.

04 What moves it

Four things that actually change this number

Driver 01

Breakdowns

The obvious cause, and usually not the biggest.

Driver 02

Material shortages

Upstream supply failures landing on the line.

Driver 03

Rush orders

Sales commitments that jump the queue.

Driver 04

Plan realism

A schedule the line was never able to run.

05 Where the number lives

The system, the record and the fields

System of recordKey recordFields you need
Planning system compared with production confirmationsPlanned order compared with Work order confirmation planned_qty, produced_qty, planned_date, actual_date, sequence

Compare against the frozen schedule, not the version updated during the shift. A schedule that follows reality always shows perfect adherence.

06 How it goes wrong

Three ways this metric misleads people

Mistake

Rescheduling to match reality

Adherence looks perfect and the metric measures nothing.

Fix: Freeze the schedule at the start of the period and score against it.
Mistake

Counting quantity but not sequence

Making the right total in the wrong order still causes stockouts.

Fix: Score sequence adherence as well as volume.
Mistake

Blaming the line by default

Most misses originate upstream in materials or in order promising.

Fix: Capture the reason at the point of deviation.

08 Questions

Frequently asked

How is this different from OEE?

OEE asks whether the line ran well. Schedule adherence asks whether it ran the right things. A line can score highly on one and badly on the other.

What is a realistic target?

High nineties in a stable process; mid eighties is common where rush orders are frequent. The reason mix matters more than the number.

One definition, everywhere it is used

SCIKIQ stores this metric once and serves it to every dashboard, board pack and agent that asks.