The COO's data checklist
Operations generates more data than any other function and trusts less of it. The reason is usually that the numbers arrive after the shift that could have used them.
01 The numbers you own
Five you should be able to defend
Not the longest list — the shortest one that covers the job. Each links to its full definition, including where the number lives and how it gets read wrong.
Overall equipment effectiveness
How much of your capacity you actually get to sell.
availability × performance × qualityOTIFOn time in full
The customer's view of whether the operation delivered.
orders_delivered_on_time_and_complete ÷ total_ordersSASchedule adherence
Whether you made the right things, not just enough things.
units_produced_as_scheduled ÷ units_scheduledScrap%Scrap and yield
Cost paid twice: material and the capacity that produced it.
scrapped_quantity ÷ total_produced (yield is the inverse)AbsenceAbsence rate
The cover cost that turns into overtime and agency spend.
days_absent ÷ scheduled_working_days02 Questions to ask
Six questions for your next review
Ask them of your own team before anyone asks them of you. The uncomfortable answers are the useful ones.
- How long after a shift ends do we know how it went — and who acts on that?
- Do the factory number and the finance number for output agree? If not, is the rule written down?
- Which losses are counted as planned, and when did anyone last review that list?
- Can we see cost per unit by line and by shift, or only by plant and by month?
- When a customer complains about service, can we tell them what happened without a phone call to the site?
- What proportion of our schedule changes are caused by rush orders rather than by breakdowns?
03 First 90 days
A plan that finishes something
Narrow and finished beats broad and half-built. Each stage produces evidence that funds the next one.
04 Where the data lives
The systems behind your numbers
| System | What it holds | Key records |
|---|---|---|
| MES and line-side capture | What actually happened, minute by minute — the only source for downtime, speed loss and scrap. | Work order, Downtime event, Batch, Quality result |
| ERP production and costing | Confirmed output, standard cost and stock valuation. | Production order, Material, Routing, Cost centre |
| CMMS and asset management | Maintenance history and condition, which lead availability. | Asset, Work request, Failure code, Spare part |
05 Questions
Frequently asked
Why do operations and finance disagree on output?
They measure different events at different times: MES counts production, ERP counts confirmation. The answer is a written reconciliation rule, not a monthly meeting.
What is the fastest operational win from better data?
Speed loss. It is continuous, invisible and free to investigate — and it is usually larger than the downtime everyone is already fighting.